Operational and connectivity issues pull down RIL CBM block output

Operational and connectivity issues pull down RIL CBM block output Production at RIL’s CBM block in Madhya Pradesh contracted to 0.94 million metric standard cubic meters a day (mmscmd) in July-September from 1mmscmd in the April-June period. https://ift.tt/2PWK98r

Comments

Popular posts from this blog

Solar Jobs Resources March 14, 2018 - HELP WANTED / TRAINING AVAILABLE: Must have sunny disposition